Nova Minerals Limited ("Nova" or the "Company") (NASDAQ:NVA) (ASX: NVA) (FRA: QM3) ) is pleased to announce that the mobilization of heavy equipment to the Estelle Project is underway via the Company's winter snow road, approximately 150km from Willow. (Figure 1). Ideal winter conditions allowed snow road construction to commence in early December, which involved pre-packing snow, water-flooding for ice thickening at major river crossings, and minor brush clearing. This winter has delivered near perfect snow road conditions with exceptionally cold temperatures that are favorable for the construction of ice bridges over 1.5m (5ft) thick. These bridges are capable of supporting freight loads well over 100,000lb (45,000kg) while preserving a hard snowpack base.