Developed and constructed entirely by EZGO, the complex covers a total site area of 19,665 square meters and a total building area of 36,547.56 square meters, comprising seven reinforced-concrete buildings: five purpose-built multi-storey production buildings and two ancillary support buildings. The underlying state-owned land use right carries a tenure of 50 years, providing the Company with a long-term and legally secured operational foundation for decades.
The complex is designed to support the annual production of 100,000 intelligent electric two-wheeled vehicles, 5,000 intelligent unmanned service patrol vehicles, and 0.5 GWh of graphene-based lightweight power lithium batteries. Integrating research and development, manufacturing and related support functions, the facility forms the physical backbone of EZGO's intelligent mobility and battery businesses.
With construction complete and full legal title secured, EZGO will now advance equipment installation and production line commissioning, with commercial operations targeted to commence in 2026. The Company believes the facility will materially strengthen its manufacturing capabilities, improve operational efficiency and broaden product innovation across intelligent electric mobility, intelligent service vehicles and lightweight power battery applications.
Login to comment