June 2026 Production Highlights

Bitcoin mined: approximately 14.92 BTC credited to the Company's mining pool accounts during June 1-30, 2026.

Average operational hashrate: approximately 1.06 EH/s realized across the Company's mining pool accounts during the period.

Fleet utilization: realized hashrate represented approximately 67% of the fleet's economic capacity during the period, reflecting a greater number and duration of curtailment events and increased low-power-mode operation in response to elevated ambient temperatures.

Installed fleet: 9,584 current-generation S21-class ASIC miners representing approximately 35 MW of installed capacity (approximately 2.19 EH/s nameplate) at a blended hardware efficiency of approximately 16 J/TH, unchanged from May 2026.

Production figures are preliminary, unaudited, and subject to final operational and financial review. Reported production reflects Bitcoin credited to the Company's pool accounts, before settlement of hosting profit-share amounts described below, and is shown net of mining-pool fees.