Pan American Silver (NYSE:PAAS) reported second-quarter financial results on Thursday. The transcript from the company's second-quarter earnings call has been provided below.
This transcript is brought to you by Benzinga APIs. For real-time access to our entire catalog, please visit https://www.benzinga.com/apis/ for a consultation.
The full earnings call is available at https://event.choruscall.com/mediaframe/webcast.html?webcastid=O3qpcxsz
Summary
Pan American Silver Corp reported strong financial results for Q2 2026, with $344 million in attributable free cash flow and a record $300 million returned to shareholders.
Silver production reached 6.5 million ounces, meeting the high end of guidance, while gold production was below expectations at 166,000 ounces, with adjustments expected in future quarters.
Full-year production guidance for silver remains on track, while gold production is expected to be at the low end of the 700,000 to 750,000 ounce range due to seismic events impacting Jacobina and lower continuity at El Peñón.
The company renewed and expanded its credit facility, increasing its size to $1.5 billion with a $750 million accordion feature, maintaining strong liquidity.
Strategic projects such as the La Colorada Skarn deposit and Timmins CAMP project are progressing, with updates expected in future quarters.
The management reaffirmed its commitment to shareholder returns, projecting up to $1 billion in returns for 2026 through share buybacks and dividends.
Full Transcript
OPERATOR
Thank you for standing by. This is the conference operator. Welcome to the Pan American Silver Corp second quarter 2026 results conference call. As a reminder, all participants are in listen-only mode and the conference is being recorded. After the presentation, there will be an opportunity to ask questions. During the question queue, you may press star then one on your telephone keypad. Should you need assistance during the conference call, you may reach an operator by pressing star then zero.
I would now like to turn the conference over to Fion Fazecki, VP, Investor Relations. Please go ahead. Ms. Fazecki.
Fion Fazecki, VP Investor Relations
Thank you for joining us today for Pan American Silver Corp's conference call and webcast to discuss our second quarter 2026 results. This call includes forward-looking statements and information and references non-GAAP measures. Please see the cautionary statements in our MD&A, Q2 news release and presentation slides for the period ended June 30, 2026, all of which are available on our website. I'll now turn the call over to Michael Steinman, Pan American's President and CEO.
Michael Steinman, President and CEO
Good morning everyone and thank you for joining us today for our Q2 2026 conference call. Q2 delivered strong financial results, strong silver production and meaningful progress on our growth project. We generated 344 million of attributable free cash flow, returned a record of 300 million to shareholders and reached an important milestone at La Colorada in early August with the first cut of the 588 decline to access the Skarn deposit. Attributable silver production of 6.5 million ounces in Q2 was at the high end of our quarterly guidance range, driven by continued strong performance at La Colorada and Juanicipio.
We remain on track to achieve our full year silver production guidance of 25 to 27 million ounces. Q2 silver segment all-in sustaining costs were $17.80 per ounce, primarily reflecting higher-cost ounces from the inventory drawdown that had accumulated at La Colorada in the first quarter of 2026, higher royalties at La Colorada from mining more tons than initially planned from the adjacent third-party concession, unfavorable currency exchange rates and higher labor-related costs.
Attributable gold production was approximately 166,000 ounces, which was below the quarterly outlook issued in February. We expect Q2 to be the weakest gold production quarter of the year, with production more heavily weighted to the fourth quarter as we indicated in Q1. Gold segment all-in sustaining costs were $1,984 per ounce in Q2, slightly above our quarterly outlook due to the lower-than-forecasted production as well as labor and materials inflation.
Importantly, for the first half of the year, all-in sustaining costs were below the low end of our guidance range for silver and in line with our guidance range for gold. Based on performance to date, we are reaffirming our full year 2026 operating outlook ranges for silver and gold production, silver segment and gold segment all-in sustaining costs and sustaining capital. Within that outlook, we now expect full year gold production to be at the low end of the 700,000 to 750,000 ounce guidance.
We have also revised our third quarter gold outlook to approximately 3,000 to 6,000 ounces below the low end of the quarterly guidance range of 178,500 to 192,000 ounces of gold. The change in our near-term gold outlook primarily reflects lower-than-expected production at Jacobina and El Peñón. At Jacobina, gold production is now expected to be approximately 10,000 ounces below the low end of the original annual guidance range of 181,000 to 191,000 ounces, reflecting changes to mining sequencing.
The mining method employed at Jacobina over the last 40 years has been open stoping with very few of the stopes backfilled. Over the last several years, Jacobina has experienced seismic events. While these events have not resulted in any injuries or infrastructure damage, after reassessing the risk associated with seismicity, we have implemented measures in Q2 that include leaving larger pillars, reducing production rates in some higher-grade areas and increasing development rates to open more mining zones.
These measures will result in overall mining grades coming in closer to average mineral reserve grade. Longer term, we are evaluating alternative Avoca-type mining methods in certain areas with waste rock backfill and cemented backfill. As part of the optimization of the Jacobina operation, Jacobina continues to be a standout performer in generating cash flow with a long reserve life and significant optimization potential. We are advancing several process plant upgrades, including installation of new carbon-in-pulp tanks and electrical control systems, both of which are expected to be commissioned this year.
We're also advancing conceptual engineering to streamline and simplify the process plant flowsheet, which will feed into a trade-off study to evaluate whether upgrading the existing process plant circuitry and removing obsolete equipment or building a new state-of-the-art processing facility is the optimal choice for this long-life asset. At El Peñón, silver production is expected to remain within the original annual guidance range of 3.65 to 3.95 million ounces.
Gold production is now expected to be approximately 10,000 ounces below the low end of the original annual guidance range of 104,000 to 111,000 ounces, reflecting lower-than-expected continuity in certain secondary structures across the portfolio. We expect gold production to improve over the balance of the year, weighted to the fourth quarter as previously indicated. Second half production is expected to benefit from higher gold grades and high throughput at Timmins and Shahuindo.
We're also managing the effects of El Niño at our operations in Chile and Argentina. Extreme rainstorms have affected site access for key personnel in July and into August. Our teams are actively managing these conditions with safety remaining the top priority. Turning to our financial results, revenue was 1.1 billion and attributable revenue including our 44% interest in Juanicipio was 1.3 billion. Net earnings were 305 million or $0.72 per share, which includes a tax expense of 179 million.
Adjusted earnings were $0.73 per share. Cash flow from operations was 320 million after 205 million of income tax paid and 17 million used for working capital. Attributable cash flow from operations was 418 million and attributable free cash flow was 344 million including our share from Juanicipio. Q2 is expected to be the highest period for taxes paid in 2026 due to final settlement of taxes for 2025. Higher metal prices have increased profitability and tax payments.
As a result, we have increased our 2026 guidance range for income taxes paid to be between 585 million to 635 million. Our financial position remains very strong. We ended the quarter with 1.8 billion of cash and short-term investments, including cash attributable to Juanicipio. In July we renewed and amended our five-year senior unsecured revolving credit facility, doubling its size to 1.5 billion and adding a 750 million accordion feature. The facility remains undrawn and our total available liquidity is approximately 3.2 billion.
This financial strength gives us substantial flexibility to invest in our operations, advance organic growth projects and return capital to shareholders. At La Colorada, development of the 588 decline to access the Skarn deposit is underway. This is a key step in advancing the planned expansion outlined in the revised PEA released in March. Engineering for the material handling system and ventilation shaft is also progressing, with the design, cost, schedule and recommendation expected before year end.
At Timmins, we are advancing the first phase of the Timmins CAMP project including the Bell Creek Shaft expansion and two exploration drifts to access Vogel and Samson deposits. We plan to release updated mineral resource and mineral reserve estimates in the third quarter and a preliminary economic assessment for the Timmins CAMP project in the first half of 2027. At Escobal, the ILO 169 consultation process continues. Government representatives visited the mine in May.
We met with representatives of the Ministry of Energy and Mines and the Vice Minister of Sustainable Development in June, and a bilateral meeting between the government and the Xinka representatives was held in July. There remains no timeline for conclusion of the consultation process and no date for the restart of Escobal. Our strong free cash flow is translating into meaningful shareholder returns. In Q2, we returned a record of 300 million in share repurchases and dividends.
To date in 2026, we have repurchased over 7 million shares under our normal course issuer bid. We have also declared a Q2 dividend of 18.4 cents per common share. The enhanced shareholder return framework we announced in May is operating as intended. Repurchases reduce the share count, increasing dividends per share and each shareholder's exposure to our asset base and future free cash flow generation. That free cash flow generation remains robust and we will continue to balance shareholder returns with investments in our growth portfolio.
And with that, I will turn over for questions.
OPERATOR
We will now begin the question-and-answer session. During the question queue, you may press star then 1 on your telephone keypad; you will hear a tone acknowledging your request. If you're using a speakerphone, please pick up your handset before pressing any keys. To withdraw your question, please press star then two. The first question comes from Lawson Rinder with Bank of America Merrill Lynch. Please go ahead.
Lawson Rinder, Analyst at Bank of America Merrill Lynch
Thank you, operator. Good morning, Michael and team. Thanks for today's update. I'd like to start, I guess, with the elephant in the room, which is Jacobina and the production issues at that asset and what that has meant for 2026 guidance. Your expectation to now be at the lower end of the gold production range. When you think about what's happened and what you've provided the market with today, what does it mean for sustaining gold production at that mine into 27 and beyond, at that just under 200,000 ounce per year range, does it impact 2027 at all?
Michael Steinman, President and CEO
Well, good morning, Lawson. Look, I mean, when you look at Jacobina and, of course, this seismic activity, I just want to make very clear this seismic activity has not created any damage to our infrastructure or anything like that, but this is something that has been going on for many years at Jacobina. The mining is an open stoping method with pillars. And, of course, if you go on mining for a long time you see activity. And if you recall, it was always our plan to put, as part of our optimization study, a backfill plant in place for several reasons.
Obviously, we want to move over this tailings dam, the conventional tailings dam, into a dry stack tailings over time and then use some of that tailings as backfill in the mine. So that was always the plan. Consulting with a lot of our specialists and our systems we have in place, we decided to move on this faster, relieve a little bit the main zones, and develop faster into other zones that we have in the mines. That requires a bit more development right now, obviously, and as you saw, impacted that gold production.
I think we got it down about 10,000 ounces last production. So not a massive impact this year. There's a lot of mitigation that we have. As we described, we leave larger pillars at the moment as a short-term mitigation. Don't forget once we have paste backfill in place, we will be able to recover a large part of those pillars. So these reserves are not lost. We just go into some other areas. Some of them have a little bit lower grade gold than what we mine right now, hence the difference.
But this is really just a postponement of the production in the future and investment in the future, stronger and larger, Jacobina. So really part of the program coming in a bit quicker because we just want to really be on the safe side. But, you know, I don't see any impact really over the long-term program. Now Jacobina has a reserve life that goes way into the 2050s right now and will continue. We have continued strong success in exploration. So when you look at the big picture here at Jacobina, I don't see really a major impact of that.
But for sure short term that's what we just reported with about 10,000 ounces of production this year.
Lawson Rinder, Analyst at Bank of America Merrill Lynch
Okay, yeah, thank you for that perspective on the short-term nature of these issues. You also described in the MD&A that El Niño impacts may continue to cause disruptions through the remainder of 2026. Will those potential impacts have been factored into the updated language around the gold production guidance?
Michael Steinman, President and CEO
Yeah, look, I mean the Niño impact we've seen mostly in Chile so far. I'm sure most of the people on the phone have heard about the big impact to some of the copper production in Chile. We had really, really strong rains, especially in the south in Florida, and it actually carried over all the way to Cerro Moro where we had lots of rains. Obviously when it gets very wet there are some daily challenges in moving your ore to the plant and pushing it to the plant when it's really wet.
But nothing of major impact there. I think the biggest impact we've seen was not actually rain-related to our operation, because the biggest impact was at El Peñón. Obviously we are far in the north; it's a very dry area, but a lot of the roads, major highways in Chile, have been interrupted, which made it quite challenging to fulfill at 100% our shift changes and bring all the people in. So we are mitigating that with different transport routes, with flying people in and out to Antofagasta, etc. So that's all included in our plan. Well, remains to be seen how the Niño effect advances this year. It looks like it's going to be quite a strong phenomenon this year. Temperatures are quite high in the water and that will move up further north, obviously, and will normally affect closer around Christmas or so Peru, hence the name El Niño. It actually comes from there, that it's happening normally closer to Christmas, and so we would expect more rains in this area.
And then later on, the effect of Niña obviously goes all around the globe. We're going to see effects in Australia and Europe, etc. So we are preparing and are prepared and preparing further at our operation, making sure that all our diversion channels and holding ponds are ready for bigger rain events at the moment. So we'll see how that advances. Obviously if it has a bigger impact, then we will inform the market. But at the moment, as I said, it was more a secondary impact so far at El Peñón, just due to a lot of infrastructure damage in the road system of central and south Chile.
Lawson Rinder, Analyst at Bank of America Merrill Lynch
Okay, great. So it sounds like that is well factored in. And then just finally, not a lot of direct discussion about the plan to return up to $1 billion of cash to shareholders this year through both buybacks and dividend. Can you just confirm that remains the target, despite that it hasn't been really clearly highlighted this quarter the way it was last quarter?
Michael Steinman, President and CEO
Well, we put out the press release last quarter with the plan and I think it's very clear that we're following on that plan. Actually, you probably saw we returned $300 million this quarter. Obviously that puts us kind of ahead in the plan. But you recall we put the plan in place really after Q1, so we had to catch up some on Q1 where we paid obviously the normal dividend, but I think we only spent about $25 million in share buybacks in Q1, so hence the catch up.
We are right on track. Obviously right now I think the idea that we published was about 35% to 40% of cash to be distributed to our shareholders. That's still absolutely in place. I think we continued maybe. Ignacio, how many shares did we buy back so far this year and above?
Ignacio
7 million.
Michael Steinman, President and CEO
And how much is there already now again? I mean, we continue obviously in June to buy back shares. Oh, sorry, in July.
Ignacio
In July we've... I think it's over 2 million.
Michael Steinman, President and CEO
2 million shares. Yeah. So we continue obviously that program very strong. I mean, obviously the total amount, Lawson, if it's exactly a billion or less, that depends on the share price of our buyback. I'm really focused on the amount of shares and number of shares that we're buying back. And absolutely that program is stronger than ever. So if you look, we're quite a bit ahead of the plan.
Lawson Rinder, Analyst at Bank of America Merrill Lynch
Thank you very much.
OPERATOR
The next question comes from Wayne with TD Securities. Please go ahead.
Wayne, Analyst at TD Securities
Yeah, thanks. Morning, guys. Just following up at Jacobina, back a couple months ago at the investor day, the discussion had still centered around the potential to increase production and the efficiencies at Jacobina. So I was just curious, was there a seismic event that occurred in the past couple months to kind of prompt this reevaluation of the mining method underground? And in light of changes here in potentially moving to more selective mining, is there still potential to scale that production at Jacobina going forward, as per some of the optimization work that you're undertaking?
Michael Steinman, President and CEO
Yeah, yeah, absolutely. As I said before, this is, as I see, more a short-term impact. There's ongoing activity on the seismic side. So, as I said, it's really the precaution we wanted to do when we looked at this with our microseismic system to make sure that everything is safe for our people, for our infrastructure. As we pointed out, there has been no damage to it. And over mid and long term, absolutely, the potential for expansion of Jacobina is exactly the same.
We are working at full speed on the optimization. You probably heard during the call that we did quite some investment in the plant and are actually looking at alternatives there as well. And let me pass it on to Martin, who will give us a bit more details on that plan.
Martin
Yeah. Hi, Wayne. Yeah, absolutely. As we look at this optimization project going forward, we're looking at really completely revamping the plant as one thing, and the tailings facility, as Michael mentioned, we need to go with a filter tailings there. And we're looking at—they've been looking for some time at the paste backfill underground. And we've completed a lot of the test work that we need to do on that in terms of the strength and the rheology of the.
So all of these things are advancing. The plant is going to take a bit of time. The current facility is maxed out. But we'll be looking at increases to the size of that plant as we go forward. And we haven't really arrived at what can the mine do to provide the plant in the future, but that's some of the things that we're working on as we advance this study. We do expect, because of this, that we'll go backwards a bit more towards the mine reserve average grade as we open up new areas in the mine.
Wayne, Analyst at TD Securities
Okay, so then it sounds like there's work being done to increase the mill capacity, but you haven't quite done all the work to see whether the mine can sustain the expanded mill capacity.
Michael Steinman, President and CEO
Well, nothing has changed on that program and what we showed, obviously, at the investor day. But this is ongoing work and it's not completed yet. But yes, we are obviously still working on that optimum size of mill. And, as you saw during the press release, we're looking at either increasing productivity in our current mill—and we are working right now on that, on increasing recoveries—or looking at a completely new mill in the future. As I mentioned before, we're looking at a mine plan here way into the 2050s and, you know, with probably strong reserve replacement for many, many years to come.
And at one point, having a larger state-of-the-art plant at Jacobina would probably make a lot of sense. But Martin and his team are still working on the technical side of that. But yeah, all going ahead as planned on that side and going ahead at full speed.
Wayne, Analyst at TD Securities
Okay, thanks. Got it. Okay. Maybe even to El Peñón. We've discussed in the past the fact that the mine has always had a pretty short reserve life that has been continually extended out with the depletion of the stockpiles. I was just curious what the proportion of production that had been historically. And then do you see this phase of lower continuity mineralization as transitory, or is that something we should be kind of modeling on a go-forward basis?
And is that going to be reflected in the upcoming reserve update? Just want to better understand how we should think about it going forward.
Michael Steinman, President and CEO
Yeah, of course we're going to put our reserve update out early September for the mid-year reserve. So of course all these changes and discoveries on the exploration side, etc., will be included in that reserve update. When you look at those smaller structures, there are smaller parallel structures to the main structures that have less continuity and need more drilling. So we removed them from the reserves for the time being. Some of them have follow-up programs with Chris and his team on exploration to add in additional drilling, and we replaced them with material from other structures that in this case have been higher silver grade and lower gold grade. Hence we are right on track on the silver production. But we are tracking a bit lower on the gold production. So there's still enough places, obviously, to go. We are still drilling and exploring a lot at El Peñón. It has been and still is a very, very large cash flow for us and has been an amazing deposit over the years, and there's still a lot to discover there. But at the moment, as I said, that move into higher grade silver will probably continue for the foreseeable future this year.
Hence we made that cut back a little bit on the gold and confirmed the silver production for the year.
UNKNOWN, Analyst
Okay, great, thanks. And maybe just last one just at Timmins, can you give us a bit of context or a bit more color on the guided increase in production in the second half and just with the planned increase in the mining rates, can you give us an update on the ground condition issues that you had encountered last year? Okay, great. Okay, thanks for taking my questions.
Michael Steinman, President and CEO
Yeah, sure. Things are going quite well at Timmins. You know, right now we've had some ups and downs in our production rates but, you know, in terms of the geotechnical seismicity we're not getting any real big events recently and the paste backfill that we implemented at Bell Creek is really helping from that regard in terms of overall recovery and controlling things. Obviously still the same plan. We're aiming here probably earlier mid next year we will present a new PEA on Timmins with, as we call, the new Timmins with all the additional satellites that we are developing right now towards two and exploration and we'll have the new plan for Timmins. You know, something that we gave you an idea at the investor day but obviously the PEA will have all the details in there done with updated reserves resources, updated mine plans, cost capital requirements, etc., to add, you know, probably substantial mine life to our Timmins deposits.
OPERATOR
Thank you. The next question comes from Cosmos Hsu with CIBC. Please go ahead.
Cosmos Hsu, Analyst at CIBC
Thanks, Michael and team, for taking my questions. Maybe my first question is on the financial side. You know, you missed earnings, you know, compared to consensus this quarter, in part due to higher taxes. So could we maybe talk about higher taxes? I noticed that, you know, the tax rate turned out to be about 37% in Q2, higher than the 32% in your first half. So with commodity prices where they are today is 37% the new normal. And then, you know, in the MD&A they also talked about the fact that more taxes resulting from higher commodity prices.
However, for the second half of the year, for tax purposes, you're forecasting $60 an ounce and $4,000 an ounce, which is slightly lower than where spot is today. So if, you know, again, commodity prices are to stay at the more elevated levels compared to what you're expecting, could taxes come in even higher than your revised guidance?
Ignacio
Good morning, Cosmos. It's Ignacio here. So yes, in terms of the taxes — hi, Cosmos — in terms of the taxes, yes, we definitely see variability quarter to quarter on the effective tax rate. As you mentioned, in Q2 we saw in the high 30s. However, in Q1 we did see high 20s. And if we look at the year as a whole so far, we're in the low 30s, which is more or less where we expected it to be. And yes, unfortunately there is some variability in Q2. We did see some true-ups related to previous quarters, so some adjustments. But in terms of the overall year, we're tracking in that low 30s area and that's more or less where we expect to be. So do keep in mind that unfortunately on the tax expense side, there is some variability. You'll see that in previous years as well, there was quite a bit of variability in what that effective tax rate is. But when you see the year as a whole, it's more or less where we expect in terms of the actual taxes paid.
Yes, we've always guided that typically in the first half of the year there's higher payments than the second half of the year. And that's due to the true-ups that we have to pay typically at the end of Q1 or early Q2. And, yeah, a lot of it has to do with the profitability of the previous year. And specifically in 2025, we saw a spike in profitability just in Q4. So that's been the big driver for these larger installments — sorry, larger true-ups that we saw at the end of Q1 and into Q2.
And that's what's driving the higher tax payments that we've posted for the first half of the year. In terms of the rest of the year, yes, we have re-guided to a range of 585 million to 635. That's more or less where we expect where metal prices are today. Higher profitability is driving that. The other factor too is that with our strong cash flows at the operations level, we are generating quite a bit of cash at the site and that cash has to be repatriated and a lot of that cash that's repatriated has withholding taxes attached to it.
So that's just frictional cost of moving money around the company. So that's another factor that's affecting that — the overall range of 585 to 635 million.
Cosmos Hsu, Analyst at CIBC
Great. Maybe at the operational level, maybe a question on El Peñón. You know, as you mentioned in the prepared remarks, also MD&A, there were some lower than, you know, certain secondary structures but you are able to maintain your silver guidance, but you have to bring down your gold guidance. So I'm just wondering, do these secondary structures, do they impact gold grades more or gold production more versus silver? I thought at El Peñón it's pretty, you know, consistent in terms of gold and silver grades coming together.
Michael Steinman, President and CEO
It's correct when you put it together that it was quite consistent. But there are actually very silver-rich lanes and then very gold-rich lanes and obviously we are blending them in the production. But what happened in the secondary structures is that some of them, as I mentioned, we took out of the mine plan because the continuity wasn't there in many of them. It's just still additional drilling needed. So the exploration is actually back in. While that's drilled we move those structures into resources and if drilling is positive they will go back from resources into the reserves.
But the production to replace that production we went into more silver-rich and less gold-rich areas. As I said, they're really both, they're not just always coming together. So the end result is that we have no problem to deliver on the silver. But there's a bit less gold in those structures right now that are developed. So it's a constant play really on the blending at El Peñón between the gold-rich and the silver-rich. And at the moment that's just what we have developed.
And so hence more silver production right now and a bit less gold production at Peñón.
Cosmos Hsu, Analyst at CIBC
Great. And then maybe one last question on project capital. I see that you were slightly below your expectations in the first half. You came in at about $84 million. You had been expecting 103 to 110. You've maintained your guidance for the year, 240 to 255 million. So is that just timing? You know, where are you going to catch up on spending on the second half? If you can just quickly talk about that?
Michael Steinman, President and CEO
Sure, I'll just start on the big picture and then hand it over to Scott. But yeah, there's definitely timing in here. I mean, you know, plays a big role, obviously, beside any new events this year. Obviously there's, you know, dry seasons and wet seasons and they're quite different in different places. You can imagine we stretch with operations from deep winters right now in southern Argentina all the way up to summer in Mexico. So you have different timing there, different, you know, parts of the year where we have the ideal time to spend that capital.
So I'll pass it on to Scott. But I, you know, I think it's just timing of spending.
Scott
Yes, exactly. Hello, Cosmos. Scott here. We had a, there was a national — we had a national strike in Bolivia which delayed the mobilization of our key tailings expansion contractor. There was a bit of a lag there and the market for, you know, large contractors in both Peru and Mexico was very competitive and there were some delays associated with their mobilization too. But nothing's been postponed. I mean, there's just a bit of a lag there and we'll pick that up later in the year.
Just to make clear here to the listeners that Bolivia had strikes on — that's nothing to do with the mine, obviously. It's strikes on the roads in the country and obviously that affected us with mobilization. So no issue on our side.
Cosmos Hsu, Analyst at CIBC
That's good to hear. Thanks again, Michael, Ignacio and Scott for answering all my questions. That's all I have. Thank you.
Michael Steinman, President and CEO
Thanks, Cosmos.
OPERATOR
Once again, if you have a question, please press Star then One. The next question comes from Kerry McCreary with Canaccord Genuity. Please go ahead.
Kerry McCreary, Analyst at Canaccord Genuity
Hi, good morning, guys. Just on the royalties at La Colorada. I mean, you're operating on that adjacent ground. Just wondering if you can give some guidance on what we should expect for that in the back half of this year and into 2027.
Michael Steinman, President and CEO
Yeah, so it's a little bit higher — but a little bit higher during Q2 that will even out during the year. There will be a bit less tonnage coming from there later this year. It's really just, you know, in our mine plan basically to get to the other side of those claims, back into structures that are fully on our claim where we operate. So it's just a short-term variability really on those royalties that were a bit higher this quarter than they will be in the future.
But I think in general this year I think we said about what, 30, 35% — report, 30 to 40, 30 to 40% of the production from there and then that will, over the years, come off. Right. I mean we sold that mine plan as part of the package and all the details are in there. Just to be very clear, 100% of all the resources of the skarn are obviously on our claims and all the new discoveries of the veins that we continuously discuss and drill are all on our claim.
So this is really more a short-term variability here in those tons coming from there.
Kerry McCreary, Analyst at Canaccord Genuity
Great. And then maybe just a question on the credit facility. I mean you have a ton of cash on the balance sheet, you're generating all the cash and you've doubled the credit facility without a lot of near-term capital spend. So just wondering what the thinking is on credit facility.
Ignacio
Hi Kerry, this is Ignacio. Generally this is just to make sure that the company has the financial flexibility that we need. Also the market conditions have been quite favorable towards investment-grade issuers like Pan American Silver Corp. So we figured it'd be a good time to take advantage of those favorable market conditions. Plus we've learned from the past that having that financial flexibility can be very positive for the company. So when opportunities come up, we can react quickly to those.
Michael Steinman, President and CEO
Yeah, of course we have very strong balance sheet. You saw there liquidity of about $3.2 billion right now. We have a lot of big projects on the go. Just mentioned the three main ones, which is obviously the La Colorada Skarn and the optimization study at Jacobina and all the work we do in our Timmins. So this is a way bigger company than it was before and it was, as Ignacio said, an opportune time and very favorable conditions to basically double our line of credit, which is undrawn but available to us in our liquidity to be able to react to any opportunity that may arise.
But at the moment it's just sitting there as we had it before and great to have.
Kerry McCreary, Analyst at Canaccord Genuity
Great. That's it for me. Thanks guys.
OPERATOR
Thank you. The next question comes from Don DeMarco with National Bank Financial. Please go ahead.
Don DeMarco, Analyst at National Bank Financial
Thank you, operator, and good morning, Michael and team. Thanks for taking my question. I'll start off with a question on Escobal. I see you hosted the government officials at the mine during the quarter. Can you share any incremental color on this meeting? For example, was this the first time that these particular officials visited the mine and was there a specific purpose to the visit?
Michael Steinman, President and CEO
No, that's not the first time. There are continuous visits by authorities to the mine. That can be just the authorities or together with representatives from the Xinka. There have been many, many visits from communities around, etc., etc. So this is not, this is not the first one. And normally, you know, we hosted a lot of visits. The mine obviously shows very well. It's in great shape. And now you can go through the plant, you can go underground, look at the dry-stack tailings facility, all the environmental work we do, and day to day.
So just, you know, great to have them there, great to have reviews and discussions with them. But yeah, no additional reason for that. That's a normal course.
Freddie, Analyst
Okay, thank you. And then shifting to Jacobina. Is there any preemptive mining support or other work that requires additional capex or would anything extra that's needed be covered within the existing sustaining capex budgets, or is the measurable impact from this initially just limited to the 10k reduction in production? Thank you.
Michael Steinman, President and CEO
Yeah, it's really that. Obviously we are working on that optimization study and you know that the additional capital that will be required for plant, paste backfill plant, that's all in engineering phase right now. And once we have all the details, Freddie, we'll share that with everyone. But at the moment, the other impact is really on that smaller, you know, small reduction on the production. But once we have all the numbers together, the engineering is done, we made the final decision on size, location, etc., of the paste backfill plant, we'll share that with everybody, of course.
Freddie, Analyst
Okay. And a question. That year to date, over costs, you're tracking below the low end of the guidance range. I see you've reaffirmed guidance. Is that a measure of conservatism or is there anything in H2 that would suggest that silver costs might rebound higher and you're closer to the midpoint of the range?
Michael Steinman, President and CEO
Yeah, very good question. Look, if you look at H1, so look at the first two quarters, we are tracking very, very well on production, we're tracking very well on costs on both metals, silver and gold. There's really these variations that we see in the quarters. You recall really, really low costs on the silver side in Q1, higher costs now. There are impacts quarter by quarter that are not always there. There are some special bonuses, special payments, true-ups of taxes, etc., etc. in some of the quarters. But when you look at the cost increases that we see, and that's for both silver and gold, there are lots of different impacts. Obviously by-product credits have a huge impact to our cost. So when you look at Q1 with way higher metal prices, those by-product credits helped us bring that cost down. Obviously quite a reduction in metal prices in Q2, hence the costs are going up.
So I don't have really a crystal ball here to look forward where metal price is going to go. And then next biggest impact are foreign exchange impacts which can be very, very large because most of our jurisdictions, actually all of our jurisdictions are in, you know, are in foreign currency, even in Canada, because we are reporting in US dollars. So strengthening of those currencies actually that we see right now obviously has a big impact to our cost.
So when you put that all together, there's a large part of cost variations that we don't really have control over because as I said, it's foreign exchange, it's metal prices, and then to a lesser extent obviously energy and diesel cost. We just want to leave the guidance right there at the moment and see how it goes in Q3. Obviously we'll give an update there, but very happy where cost tracking is for the first six months for both gold and silver.
Freddie, Analyst
Okay, that's all for me. Thank you again for taking my question.
OPERATOR
We have a follow up question from Lawson Rinder, the Bank of America. Please go ahead.
Lawson Rinder, Analyst at Bank of America Merrill Lynch
Yeah, thank you, operator. Thank you guys for taking the follow up. Wanted to ask about Escobal and just note that since the approval of the construction permits for the Arra Dorada mine in Guatemala, I mean, several indications have pointed to a much more forceful level of government support for mining generally in the country. And I'd be curious to hear your thoughts on whether or not you agree with that. And then further to that, Hera Dorada was able to touch on a real hot button issue at the mine, which was water purification from volcanic ash and issues from the past that had nothing to do with mining.
But nevertheless they were able to generate a lot of community support through their efforts to help purify river water. I'm just curious if there's something like that at Escobal that might be one particular key issue and ultimately what I'm trying to get at is what are the key issues being discussed between the government and the Xinka at the current moment?
Michael Steinman, President and CEO
Thank you. Yeah, sure. Look, I don't think you should draw lines here between different projects and less operation, and not many operations in Guatemala. There are, you know, they're all in different areas, different communities, and very different realities where they stand. Obviously we have to go through that ILO 169 consultation, which is a court-ordered process that goes years back now, has been a long, long process. But I don't think that you can just draw conclusions from other projects to this one, as every project in Guatemala is quite a different reality.
Discussions are still around very similar topics. Of course, like any mining project, it's water. Normally it's kind of dust in many places. Obviously not a big topic in an underground mine except our tailings. It's vibration from blasting and other typical impacts that you would see from a mine operation. So those are really the main discussion items. But yeah, don't just draw lines from one project to the other. We really have to focus on each project in a country separate.
Lawson Rinder, Analyst at Bank of America Merrill Lynch
Okay, Michael, thanks for those comments. And then with respect to your reserve and resource and exploration update timing, you mentioned third quarter, could we maybe try to put a bit of a finer point on it? Is it possible it could be out later in August or would this be sort of a middle September event?
Michael Steinman, President and CEO
Will be a September event, earlier September, but yeah, just a few weeks away.
Lawson Rinder, Analyst at Bank of America Merrill Lynch
Thank you very much.
Michael Steinman, President and CEO
Thank you.
OPERATOR
This concludes the question and answer session. I would like to turn the conference back over to Michael Steinman for closing remarks. Please go ahead.
Michael Steinman, President and CEO
Thank you, operator, and thanks everyone for calling in today. Strong silver production and strong financial results bolstered our already robust balance sheet even further and allowed us to return, as you saw, $300 million to shareholders between share buybacks and dividends. So very strong result on that plan. Our capital allocation priorities remain the same. We maintain a solid balance sheet, $3.2 billion of liquidity right now, together with our line of credit undrawn, invest in our high-return projects.
I mentioned that La Colorada, of course, Jacobina optimization and our Timmins projects, and continue to deliver solid returns to our shareholders in the form of share buybacks and dividends. We already see metal prices recovering. I hope that will continue obviously from their typical summer low. And as I mentioned just now in the last question, we plan to release our mineral reserve and resource update in September and are looking forward to giving an update on all that, the efforts and, you know, very, very nice results we had during the year on many, many exploration projects in the company, and give you an update on that in early September.
Until then, thanks everybody for calling in.
OPERATOR
This brings to a close today's conference call. You may disconnect your lines. Thank you for participating and have a pleasant day.
Disclaimer: This transcript is provided for informational purposes only. While we strive for accuracy, there may be errors or omissions in this automated transcription. For official company statements and financial information, please refer to the company's SEC filings and official press releases. Corporate participants' and analysts' statements reflect their views as of the date of this call and are subject to change without notice.
Login to comment